Install this theme
REQUIREMENTS BY 4/2 MONDAY
  1. March 21st, 23rd, Wednesday and Friday are work days. There will be no lectures. Please use the next 4 days wisely, so that you have all the drawings and materials to laser cut your pieces by Friday 23rd. Show me your progress in studio.
  2. March 26th, Monday is Spring Break. So please post photographs of the model that is due (either 1/16, 1/8, or 1/4) on your Tumblr. This model should have more details than the massing model, in terms of fenestration and structure. Site is also a critical feature.
  3. April 2nd, Monday is when your (refined/revised) concept model, massing model, fenestration/structure model, and FINAL MODEL is due. This final model should have majority of the detail excluding furniture. Furnitures are objects, not spatial components. Not important.
  4. You also have to make at least a massing model of your own house, you are free to do more work. Such dilligence is highly recommended and encouraged.
  5. You have to make a .PDF at 36 x 24 (Landscape) which contains:
  • Analysis Drawing
  • Photographs of all the process models
  • Narrative

ALL YOUR WORK MUST BE POSTED TO YOUR TUMBLR ACCOUNT

 Enjoy your Spring Break :) xoxo