Install this theme
REQUIREMENTS FOR 3/19 MONDAY

Required for Monday is:

  1. Your massing model (either 1/32” = 1’-0” or 1/16” = 1’-0”)
  2. Photographs of massing model posted to Tumblr

But also, you should be starting to do extra work so that you can be ahead of schedule. These include:

  1. Digital Model (Rhino Model built accurately to scale, with Grid, Layers)
  2. Revised/Refined Concept Model
  3. Concept Model of your own house
  4. Massing Model of your own house (at the same scale as the project house)

Keep Working, save yourselves from ruining your spring break