May 2012
1 post
Final Review Presentation Time & Order
Room 214 9:00 am -Girem Yoo -Justin Wong 9:45 am -Izak Wood Ferren -Gerald Sarmiento 10:30 am -Dustin Chan -Ema Tsutsumi -Ryan Ching 11:15 am -Mark Agaran -Brandon Large Room 215 9:45 am -Jefferey Wang -Jesse Woehrle 10:30 am -Morgan Fullmer -Angela Yoshioka 11:15 am -Alessandra Olsen 12:45 pm -Shirley Hong
May 2nd
April 2012
1 post
REQUIREMENTS BY 4/9 MONDAY
April 4th, Wednesday is reserved for school-wide charratte. April 6th, Friday is a holiday. No Studio. By Next Monday, please finish the following requirements: Concept Model of your complementary house Massing Model of your complementary house You may have more than one idea, so make as many as you want You should keep the massing model at a consistent scale You can assume the location,...
Apr 4th
March 2012
6 posts
REQUIREMENTS BY 4/2 MONDAY
March 21st, 23rd, Wednesday and Friday are work days. There will be no lectures. Please use the next 4 days wisely, so that you have all the drawings and materials to laser cut your pieces by Friday 23rd. Show me your progress in studio. March 26th, Monday is Spring Break. So please post photographs of the model that is due (either 1/16, 1/8, or 1/4) on your Tumblr. This model should have more...
Mar 20th
REQUIREMENTS FOR 3/19 MONDAY
Required for Monday is: Your massing model (either 1/32” = 1’-0” or 1/16” = 1’-0”) Photographs of massing model posted to Tumblr But also, you should be starting to do extra work so that you can be ahead of schedule. These include: Digital Model (Rhino Model built accurately to scale, with Grid, Layers) Revised/Refined Concept Model Concept Model of your...
Mar 18th
REQUIREMENTS FOR 3/16 FRIDAY
Friday, as usual, will be a lecture by Professor Longhi. It will not take the entire class time, so we will have some time in studio to discuss your progress for Monday’s presentation (of your models) Thank you for those who attended the tutorial session, I’m sorry if I didn’t cover topics you were expecting, or you were completely lost. Please don’t blame me. :) Now that...
Mar 15th
REQUIREMENTS FOR 3/14 WEDNESDAY
Required for Wednesday are: 1. Revised/New Concept Model if necessary (not due, but start) if your concept model is not clearly representing the parti,  you used the wrong material, scale, form horrible craftsmanship you just got a great idea and want to do more work 2. Have supplies ready Museum Board or White Matboard Architectural/Engineering Scale 3. Plans, Sections, Elevations of the...
Mar 13th
Requirements for 3/12 Monday
Required for Monday are: 1. Concept Model (As many as desired) 2. Analysis Drawings Parti Structure Massing Geometry Additive and Subtractive Hierarchy Repetitive to Unique Symmetry and Balance Circulation to Use-Space Natural Light 3. Written Narrative (As concise/elaborate as desired) 4. Tumblr with three items uploaded (Photos, Images, Drawings, Text) On Monday, each student may...
Mar 11th
Tumblr Addresses
Click on the Names Agaran, Mark [Farnsworth House, Ludwig Mies Van der Rohe] Chan, Dustin [De Blas House, Alberto Campo Baeza] Ching, Ryan [Villa Shodhan, Le Corbusier] Fullmer, Morgan [Casa en Canoa, Oscar Niemeyer] Hong, Shirley [Casa Gilardi, Luis Barragan] Large, Brandon [Casa Tolo, Alvaro Siza Vieira] Olsen, Alessandra [Villa Savoye, Le Corbusier] Sagun, Kekai [Fisher House, Louis...
Mar 11th